B. Coleman Hangar Phase II

ClientB. Coleman Aviation
Address5701 Airport Road Gary, IN
RoleDesign Build
Start/Finish06/2017 - 11/2017
Contract Amount$4,000,000
Type New Construction

B.Coleman Hangar Phase II

Burlng Builders, Inc served as the General Contractor for this project, which consisted of the New Construction of a 40,000-SF airplane hangar. The structure of this facility was a Pre-Engineered Metal Building with a 180’x28’ rolling hangar door. This project included the installation of slab armour concrete finish, plumbing, HVAC, fire protection, and electrical with state of the art LED lighting, the building foundations located at the rear of building allow for future expansion tenant build out.