301 S Columbus Dr, Chicago, IL 60605
General Contractor
Recreation
Burling served as the General Contractor for the Buckingham Fountain historical renovation project. which included demolition of the fountain table, installation of extensive under drainage system, new landscaping, site lighting, signs, sewer system, selective demolition with or adjacent to the fountains out basin, repairs to existing cast-in-place concrete elements and installation of new cast-in-place elements. All scope of work was performed successfully in line with the historic preservation requirements.
Chicago Park District
Thompson Dyke & Associates
$8,966,271
2009