Project Overview
Burling served as the General Contractor for the ComEd Maywood Tech Center Storm Water Basin project. This project consists of the reconstruction of two storm water treatment basins including: selective demolition and re-lining the basins with concrete, replacement of mechanical and chemical pumps and controls, power and low voltage work for mechanical equipment, selective storm water piping replacement and pre-cast concrete structures associated with chemical pumps electrical panels.