Project Overview
Burling served as the general
contractor for the ComEd OCC Joliet Arena
upgrade project. This is a critical facility for
ComEd, it’s the hub to their daily operations
especially during storm events. This
project consisted of an interior renovation
upgrade. The space was divided into (6)
phases to ensure daily operations were not
disturbed. The existing ceiling, electrical, fire
suppression and HVAC will be removed and
replaced in each phase. New fire suppression,
HVAC, electrical, flooring, and ceilings
were installed in each phase. All work was
completed within an occupied critical facility.