10000 W. O'Hare Ave., Chicago, IL 60666
General Contractor
Aviation
Burling provided design build services of this curbside signage fabrication and installation project for terminal 1. This project scope included lower level electrical installation, welding construction of new signage, LED lighting and panels. The installation coordination needed to be completed in the evening as to not interrupt the airlines and pedestrian traffic. Burling worked with the designer in the sign design process and coordinated low voltage and programming with the United IT Dept.
United Airlines
xxx
$1,393,567.00
2022